General information
Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs-protocol
Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs - conflict of interests
Supply and installation of Line switchgears for Spandaryan and Shamb HPPs-protocol
Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs -chang.
Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs
Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs -chang.
Supply of Bearing pads segments for Shamb and Spandaryna HPPs-protocol
Supply of Bearing pads segments for Shamb and Spandaryna HPPs- conflict of interests
Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs -chang.
Supply and installation of Line switchgears for Spandaryan and Shamb HPPs-protocol
Supply and installation of Line switchgears for Spandaryan and Shamb HPPs-conflict of interests
Acquisition of a deep well submersible pump for Spandaryan HPP-contract
Partial discharge measurement device-contract
Purchase of computer equipment -contract
Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs-contract
Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
,,ContourGlobal Hydro Cascade,, CJSC Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-conflict of interests
Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-conflict of interests
Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-contract
Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
Purchase of computer equipment-conflict of interests
Purchase of computer equipment-protocol
Purchase of computer equipment-contract
Purchase of computer equipment-protocol
Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-contract
Printer MFP, delivery and installation-contract
Acquisition of a deep well submersible pump for Spandaryan HPP - conflict of interests
Acquisition of a deep well submersible pump for Spandaryan HPP-contract
Acquisition of a deep well submersible pump for Spandaryan HPP-protocol
Purchase 50 bar air pressure compressor-contract
Acquisition of a deep well submersible pump for Spandaryan HPP-protocol
Network equipment purchase-contract
Acquisition of a deep well submersible pump for Spandaryan HPP-chang.
Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs - conflict of interests
Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-contract
Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-protocol
,,ContourGlobal Hydro Cascade,, CJSC Acquisition of a deep well submersible pump for Spandaryan HPP-cancel
,,ContourGlobal Hydro Cascade,, CJSC Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs- conflict of interests
Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs-contract
Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs-protocol
Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-protocol
Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs-protocol
Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
Printer MFP, delivery and installation-conflict of interests
Printer MFP, delivery and installation-contract
Supply of Partial Discharge Measurement Device-conflict of interests
Supply of Partial Discharge Measurement Device -contract
Supply of Partial Discharge Measurement Device -contract
Supply of Partial Discharge Measurement Device -protocol
Printer MFP, delivery and installation-protocol
Printer MFP, delivery and installation-protocol
Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-protocol
Acquisition of a deep well submersible pump for Spandaryan HPP
Supply of Partial Discharge Measurement Device for ContourGlobal Hydro Cascade CJSC -protocol.
ՔԳՀԿ Գնումների Ընթացակարգ(14/12/22)
Acquisition of a deep well submersible pump for Spandaryan HPP-chang.
Procurement of a 50-bar air pressure compressor-announcement of signing a contract
Procurement of a 50-bar air pressure compressor.-Protocol
Procurement of a 50-bar air pressure compressor-conflict of interests
Network equipment purchase-conflict of interests
Network equipment purchase-announcement of signing a contract
Network equipment purchase-protocols
Procurement of a 50-bar air pressure compressor.-Protocol
Procurement of a 50-bar air pressure compressor-protocol
Կնքված է պայմանագիր Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակում
Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակման աշխատանքներ շահերի բախման բացակայություն
Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակման աշխատանքներ-հայտարարությու պայմանագիր կնքելու մասին
Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակման աշխատանքներ-արձանագրություններ
Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակման աշխատանքներ բացման նիստի արձանագրություն
Չեղարկված ընթացակարգ Տաթև, Շամբ և Սպանդարյան ՀԷԿ-երի գնդային փականների ուսումնասիրության աշխատանքներ
Procurement Procedure
PROCUREMENT PROCEDURE CGHC Arm.
PROCUREMENT PROCEDURE CGHC ENGLISH