Filtered by:

General information

  • Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs-protocol
  • Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs - conflict of interests
  • Supply and installation of Line switchgears for Spandaryan and Shamb HPPs-protocol
  • Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs -chang.
  • Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs
  • Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs -chang.
  • Supply of Bearing pads segments for Shamb and Spandaryna HPPs-protocol
  • Supply of Bearing pads segments for Shamb and Spandaryna HPPs- conflict of interests
  • Supply of Thrust bearing cooler for Shamb and Spandaryna HPPs -chang.
  • Supply and installation of Line switchgears for Spandaryan and Shamb HPPs-protocol
  • Supply and installation of Line switchgears for Spandaryan and Shamb HPPs-conflict of interests
  • Acquisition of a deep well submersible pump for Spandaryan HPP-contract
  • Partial discharge measurement device-contract
  • Purchase of computer equipment -contract
  • Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs-contract
  • Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
  • ,,ContourGlobal Hydro Cascade,, CJSC Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
  • Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-conflict of interests
  • Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-conflict of interests
  • Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-contract
  • Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
  • Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
  • Purchase of computer equipment-conflict of interests
  • Purchase of computer equipment-protocol
  • Purchase of computer equipment-contract
  • Purchase of computer equipment-protocol
  • Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-contract
  • Printer MFP, delivery and installation-contract
  • Acquisition of a deep well submersible pump for Spandaryan HPP - conflict of interests
  • Acquisition of a deep well submersible pump for Spandaryan HPP-contract
  • Acquisition of a deep well submersible pump for Spandaryan HPP-protocol
  • Purchase 50 bar air pressure compressor-contract
  • Acquisition of a deep well submersible pump for Spandaryan HPP-protocol
  • Network equipment purchase-contract
  • Acquisition of a deep well submersible pump for Spandaryan HPP-chang.
  • Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs - conflict of interests
  • Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-contract
  • Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-protocol
  • ,,ContourGlobal Hydro Cascade,, CJSC Acquisition of a deep well submersible pump for Spandaryan HPP-cancel
  • ,,ContourGlobal Hydro Cascade,, CJSC Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs- conflict of interests
  • Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs-contract
  • Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs-protocol
  • Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-protocol
  • Preparation of design and cost estimate for lightning protectors in HPPs and reservoirs-protocol
  • Design, manufacture, supply, installation and commissioning of two new 80MVA -110 / 10.5 kV power transformers for Tatev HPP-protocol
  • Printer MFP, delivery and installation-conflict of interests
  • Printer MFP, delivery and installation-contract
  • Supply of Partial Discharge Measurement Device-conflict of interests
  • Supply of Partial Discharge Measurement Device -contract
  • Supply of Partial Discharge Measurement Device -contract
  • Supply of Partial Discharge Measurement Device -protocol
  • Printer MFP, delivery and installation-protocol
  • Printer MFP, delivery and installation-protocol
  • Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs-protocol
  • Acquisition of a deep well submersible pump for Spandaryan HPP
  • Supply of Partial Discharge Measurement Device for ContourGlobal Hydro Cascade CJSC -protocol.
  • ՔԳՀԿ Գնումների Ընթացակարգ(14/12/22)
  • Acquisition of a deep well submersible pump for Spandaryan HPP-chang.
  • Procurement of a 50-bar air pressure compressor-announcement of signing a contract
  • Procurement of a 50-bar air pressure compressor.-Protocol
  • Procurement of a 50-bar air pressure compressor-conflict of interests
  • Network equipment purchase-conflict of interests
  • Network equipment purchase-announcement of signing a contract
  • Network equipment purchase-protocols
  • Procurement of a 50-bar air pressure compressor.-Protocol
  • Procurement of a 50-bar air pressure compressor-protocol
  • Կնքված է պայմանագիր Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակում
  • Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակման աշխատանքներ շահերի բախման բացակայություն
  • Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակման աշխատանքներ-հայտարարությու պայմանագիր կնքելու մասին
  • Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակման աշխատանքներ-արձանագրություններ
  • Տոլորսի ջրամբարի վանդակաճաղը մաքրող համակարգի վերականգնման նախագծի մշակման աշխատանքներ բացման նիստի արձանագրություն
  • Չեղարկված ընթացակարգ Տաթև, Շամբ և Սպանդարյան ՀԷԿ-երի գնդային փականների ուսումնասիրության աշխատանքներ
  • Procurement Procedure
  • PROCUREMENT PROCEDURE CGHC Arm.
  • PROCUREMENT PROCEDURE CGHC ENGLISH
  • No results found.