Preparation of design and cost estimate documentation for the major repair of the spillways of the embankment dam of Shamb and Spandaryan reservoirs
Reference number 2025-08
Documents
Date of Publishing
13.05.2025
Reference number 2025-08
Documents
Date of Publishing
13.05.2025